পাতা:বাংলাদেশের স্বাধীনতা যুদ্ধ দলিলপত্র (তৃতীয় খণ্ড).pdf/১৮৮

উইকিসংকলন থেকে
এই পাতাটির মুদ্রণ সংশোধন করা প্রয়োজন।

156 বাংলাদেশের স্বাধীনতা যুদ্ধ দলিলপত্রঃ তৃতীয় পত্র d. Telephone, Telegraphs and wireless system. e. Irrigation and Flood control system for agriculture to be taken up later. Field Surveyors are required for preparation of plan and estimates. The preparation of economic estimates and drawing up of phased development programme require the services of Engineers. The Engineering Department will implement fieldworks and prepare plan and estimate while the Planning Cell will process the schemes for approval. 3. Youth Camps. The Services on the Engineering personnel are considered necessary to impart training on brief technical know-how to Mukti Bahini. 4. Relief Camps. The services of the Engineers are required in relief Camps to mitigate sufferings of the evacuees. Recently Col. Luthra, Additional Secretary to Rehabilitation Department, Union Government has given as statement in this respect. We may take up this issue with the local Government. In consideration of the above facts, the Minister, R. R. & H. A. asked me to put the case before him (Prime Minister) so that the Engineering Department is set up keeping in view of the requirements of different departments. I beg to add that a separate note on this utilization of the services of Engineers was submitted on 20. 7.71 for his perusal. (Md. Emdad Ali) Chief Engineer.